Provide the following information/documents. Each numbered item below should be copied and appear at the top of a page with your information below.
| 1. | A description of the proposed facility, adequately specifying the exact route to which the application relates. This must include key design codes to demonstrate technical feasibility and a clear and detailed map of the route, at a scale acceptable to the Energy Regulator, indicating the proposed: |
| (a) | design capacity and pressure of each pipeline; |
| (b) | length of each pipeline; |
| (c) | diameter of each pipeline; |
| (d) | material composition of the pipeline e.g. steel or HDPE; |
| (e) | average and maximum operating pressures; |
| (f) | location of each compression site and its capacity; |
| (g) | location of each pressure protection or reduction station; and |
| (h) | point(s) of receipt and delivery of gas. |
| 2. | A mechanical flow diagram of the proposed facility. |
| 3. | Proof of the financial viability of the proposed facility, including: |
| (b) | projected financial statements and/or discounted cash flow (DCF) model (providing assumptions used in calculations and sourcing of figures); |
| (c) | the status and/or proof of equity financing agreements and finance including terms and conditions; |
| (d) | other costs incidental to the project (please specify whether legal, consulting etc) ; and |
| (e) | tariffs to be charged for the proposed facility and details of the methodology used for these calculations. |
| 4. | Details of the gas source, including |
| (a) | a copy of an independent reservoir engineer's assessment of proven and recoverable gas reserves in trillions of cubic feet and the basis for the reserves determination; and |
| (b) | gas production program to supply gas for the project; |
OR
| (c) | copy of the gas importation agreement. |
| 5. | Details of any existing and/or potential customers for the proposed facility, including: |
| (a) | the names and physical addresses of existing customers; |
| (b) | the names and physical addresses of potential customers; |
| (c) | the categorization of each customer, for example, as a distributor, power generator or large user; and |
| (d) | for each customer, the average or anticipated gas consumption in Gigajoules per annum. |
| 6. | Copies of any gas transportation agreements pertaining to the facility to be constructed. |
| 7. | A description of the proposed allocation mechanism in terms of which third party access will be granted to the proposed facility, including: |
| (a) | grounds for refusal of access; and |
| (b) | measures to ensure non-discrimination between customers. |
| 8. | If applicable, details of planned changes to the pipeline after commencement of operations regarding: |
| (a) | pipeline capacity such as additions of compressor stations or any other infrastructure that may require a new licence; |
| (b) | investment plans and the schedule of implementation; and |
| (c) | timelines for service commencement. |
| 9. | If the applicant is Sasol Limited or its subsidiary, evidence of compliance with clauses 3, 4, 6 and 8.3 of Schedule One to the Agreement. |